 Grant Johnston: Managing Director “That’s ******* amazing” Commenting on 75% reduction of WIP in under 3 weeks.

Brad Johnston: Operations Director “I’m very pleased with that” (known for his understatements) when seeing throughput increase by ~20% within 5 days of a 3 day solution implementation.

Jessie: Afternoon Shift Foreman, "Wow I like this system. My people on my shift no longer have to come to me to find out what to do next, the buffer boards show them”. Jessie: also said “Loading trucks and meeting delivery is now just so easy”

Rick: Day Shift Truck Loader was ecstatic “I can load 4 trucks now in the same time as 1 before that's incredible”

Dragi; Production Manager,“We were averaging 74 tonnes per day now that has jumped to 87 tonnes per day consistent”. (+18%)

Terry, Finance Director: “We have to wait a while before we can say we are making more throughput (a known conservative) but I can say we are making the same as before but so much more easily”.

Gigangit, Production Manager: “We got enough space now to play cricket"

video

Exepron

exepron

Exepron is a unique multi-project Critical Chain Project Management Software solution with embedded real time intelligence to plan, schedule and execute projects.
Exepron answers the 7 most critical questions of project management in real time.
Contact us to find out how.

NEWS

Download PDF version here...
No matter how you measure it, be it:more profitabilitymore cashshorter lead timesless inventorygreater capacityprojects delivered on time to budget an...
 Grant Johnston: Managing Director “That’s ******* amazing” Commenting on 75% reduction of WIP in under 3 weeks.Brad Johnston: Operations Direc...
Below is a small selection of results TOC3 practitioners have helped achieve for companies in Australia and New Zealand. In the following re...
REAL RESULTS - Fast, Safe and SustainableSince the early 1990’s companies around the world including Australia and New Zealand have been ac...

In a nutshell

“I can load four trucks now in the same time as one before” Rick: ecstatic Day Shift Truck Loader ...
 Grant Johnston: Managing Director “That’s ******* amazing” Commenting on 75% reduction of WIP in under 3 weeks.Brad Johnston: Operations Director “I’m very pleased with that” (...
Write to info@toc3.com.au orCall: 1300 919 761 or 0418 207 362We will be delighted to answer your questions.Andrew KayDirectorTOC3PO Box 551Glebe, NSW, 2037Australia...
PROJECT MANAGEMENT THAT DELIVERS30 DAY FREE TRIAL Synchronize 50 Projects 15 GB Storage Capacity Unlimited User Access Global Collaboration No CustomizationStart now...
Theory of Constraints is not a secret but it might well as be.  To achieve rapid, significant and lasting business improvement demands a profound change in thinking. Thinking has to shift ...
Independent research shows that conventional (and we mean the main stream methods) do not consistently deliver projects on time, to budget or scope. On average 4 out of 5 projects fail ...
Are your projects running late and over budget? Do you have to trim the project specifications in order to meet budget or promised due date? Do resources become overstretched? Is there much ...
The Problem with ProjectsThe problem with projects is that all projects have problems. Some are more severe than others. When 4 out of 5 projects are reported to fail; either not delivered o...
At TOC3 we believe in win/win Theory of Constraints partnerships and alliances.  We look for and build lasting relationships built on trust, mutual respect and a common drive to de...
How to have crystal clear, rapid and effective thinking and communication where everyone is on the same side with almost instant positve bottom line results. Read More.....

Login Form



TOCICO

tocico_1

Certified Practitioners